Look up terms in ABT 06
In a design-build contract, ABT 06 (the Swedish general conditions for design-build contracts) applies, with among other things a different allocation of design responsibility. Yesper answers from your uploaded copy, with references to the right provision. Relevant in procurement and production.
How to do it in Yesper
- Ask the question in the chat.
- Point out the reference library holding your own ABT 06 if you want to steer the search.
- Read the answer with references.
- Compare against your own AB 04 (the general conditions for construction contracts) if needed.
Settings & tips
- Ask for the differences against your own AB 04.
- Check what the contract refers to.
Example prompts
What does ABT 06 say about design responsibility?
How is liability for design errors regulated in ABT 06 compared with AB 04, and what does that mean for the warranty period in our design-build contract? State the provisions.
FAQ
When does ABT 06 apply?
In design-build contracts – check what the contract refers to.
Can Yesper compare with AB 04?
Yes, if your own AB 04 is in the reference library.
Do I get references?
Yes, to the right provision.