Look up terms in AB 04

AB 04 (the Swedish general conditions for construction contracts) governs most things in a construct-only contract. Yesper searches AB 04 and answers with references to the right chapter and section – useful in disputes and tender review. Relevant in procurement and production.

How to do it in Yesper

  1. Ask the question in the chat.
  2. Point out the AB 04 reference library if you want to steer the search.
  3. Read the answer with chapter and section references.
  4. Ask for an interpretation tied to your situation.

Settings & tips

  • Frame the question around the concrete case (for example ÄTA work, delays, inspections).
  • Compare against ABT 06 (the general conditions for design-build contracts) if you are unsure which one applies.

Example prompts

Simple

What does AB 04 say about delay and penalties?

Advanced

What does AB 04 say about the client's right to a deduction when delivered concrete has a lower strength class than specified but was approved in the self-inspection? State chapter and section and interpret for our case.

FAQ

Do I get chapter and section references?

Yes.

Can I compare with ABT 06?

Yes, ask for a comparison.

Can the answer be tied to my case?

Yes, describe the situation.