Calculate excavation and fill volumes (Fall A/B) from a bill of quantities

Excavation and fill volumes per Fall A/B (the Swedish reuse classifications) are needed for estimating, quantity adjustment and mass balance. Yesper reads the bill of quantities and extracts excavation (CB) and fill (CE) grouped by Fall A and B, with an excavation-vs-fill summary and a plausibility check. Most valuable in the estimating and production stage.

How to do it in Yesper

  1. Add the bill of quantities (.xlsx).
  2. Ask Yesper to extract excavation and fill volumes per Fall A/B.
  3. Get an excavation vs fill summary.
  4. Review the plausibility check in Yesper and download if needed.

Settings & tips

  • Works best on bills of quantities with a KOD/TEXT/ENHET/MÄNGD structure (code, description, unit, quantity).
  • Look at items flagged as unbalanced.

Example prompts

Simple

Extract excavation and fill volumes from our bill of quantities.

Advanced

Extract soil excavation (CB) and fill (CE) per Fall A and Fall B from the bill of quantities in Secure folders, compile excavation vs fill and the mass balance, and flag items where the categories are unbalanced.

FAQ

Which AMA codes are used?

Among others CB (excavation) and CE (fill).

What are Fall A/B?

Reporting cases that Yesper keeps separate in the summary.

Do I get a mass balance?

Yes, ask for excavation vs fill.