Manage nonconformities and write a nonconformity report
Nonconformities need to be documented and followed up to lead to action. Yesper writes a nonconformity report with cause, consequence and corrective action and can keep a register for follow-up. Most relevant continuously in production.
How to do it in Yesper
- Describe the nonconformity, or point to the material in Secure folders.
- Ask Yesper to write a nonconformity report with cause, consequence and corrective action.
- State who is responsible and the action date.
- Collect the nonconformities in a register for follow-up.
Settings & tips
- Keep a nonconformity register so status and trends stay visible.
- Link the nonconformity to the right self-inspection or control point.
Example prompts
Write a nonconformity report for the wrong concrete grade.
Write a nonconformity report for concrete delivered to the pedestrian and cycle underpass being C28/35 instead of the specified C32/40 but marked as approved: cause, consequences for load-bearing capacity and durability, and a proposed corrective action and follow-up.
FAQ
Can I follow up nonconformities?
Yes, in a register with status and dates.
Are they linked to the self-inspection?
Yes, state the control point.
Do I get a ready report structure?
Yes, cause–consequence–action.