Produce an inspection plan under PBL

An inspection plan under PBL governs inspection points, inspection methods and the responsible inspector. Yesper produces a plan adapted to the measure. Most relevant ahead of the permit or notification.

How to do it in Yesper

  1. Describe the measure and its scope, or point to the material in Secure folders.
  2. Ask Yesper to create an inspection plan under PBL.
  3. Let Yesper suggest inspection points and inspection methods.
  4. Review in Yesper and hand it over as input to the certified inspection supervisor (kontrollansvarig).

Settings & tips

  • Point out the PBL reference library.
  • State whether the measure requires a permit or a notification.

Example prompts

Simple

Create an inspection plan under PBL for our measure.

Advanced

Create an inspection plan under PBL for the new construction of a pedestrian and cycle underpass in cast-in-place concrete, with inspection points, inspection method (self-inspection/certified expert) and references to the applicable requirements.

FAQ

Does it follow PBL?

Yes, the structure is based on the PBL requirements.

Who is responsible for the plan?

The certified inspection supervisor – Yesper provides the input.

Can it be adapted to the measure?

Yes, describe it.