Do a risk assessment ahead of a work operation
A risk assessment ahead of a work operation catches the risks before they become incidents. Yesper identifies risks with probability and consequence and suggests protective measures in a risk matrix. Most relevant ahead of high-risk operations, preferably linked to the work preparation.
How to do it in Yesper
- Describe the work operation, or point to the work preparation in Secure folders.
- Ask Yesper to list risks with probability and consequence.
- Get suggested protective measures per risk.
- Review in Yesper and feed it into the work preparation.
Settings & tips
- Ask for a risk matrix (probability times consequence).
- Point out the AFS library (the Swedish Work Environment Authority's regulations) for regulation-linked measures.
Example prompts
Simple
Do a risk assessment for lifting precast elements.
Advanced
Do a risk assessment for lifting precast concrete elements for the GC-porten next to the pedestrian route on road 52, with a risk matrix, protective measures and a reference to the relevant AFS provision for lifting.
FAQ
Do I get a risk matrix?
Yes.
Can measures be linked to AFS?
Yes, point out the AFS library.
Can it be added to the work preparation?
Yes.