Anyone who has sorted old foundations along a line knows this. Out, cut down or left: it depends on where each one sits, next to the track, in the way of the new design, in ground that gets restored. The removal plan was drawn before the new design was final.
One case on our Try page: a foundation inventory for a resignaling. Yesper gave every foundation its action under the special provision. 51 at the new duct bank must be removed completely; the removal plan says cut down or abandon. And 291 CY of concrete is over the recycler's chromium limit.
The sheets get revised before the bid package goes out. The landfill volume is in the estimate, not a change order. Same for the jobs next to it on the Try page: a coordinate check of OCS foundations, an earthwork balance with contaminated soil.
Get news and articles in your inbox.
Yesper is the AI civil engineer for construction and infrastructure. AFRY, COWI, NRC Group and other Nordic firms use it to halve the time on a study, rerun calculations in minutes, and catch errors that would otherwise slip through. Get in touch if you'd like to see what it can do for you.
Book demo