The cable schedule is always one revision behind

Anyone who reviews electrical packages knows it. Sheets and schedule drift apart: a plan gets revised, the schedule doesn't, a tag gets copied and never changed. Checking every tag against every row is a day nobody has before the set goes out.

One case on our Try page: electrical sheets from a submittal, checked against the cable schedule. 30 of 40 tags matched; Yesper marked them green on the sheets and wrote the rest up as review comments. Four cables on the revised lighting plan weren't in the schedule at all.

The schedule gets fixed before the set goes out, and the mismatch is a review comment, not an RFI from the field. Same for the rest of the Try page: a review protocol for a design package, a coordinate check on foundation drawings, the revisions between two drawing issues.

Try it yourself →

Benjamin Glaser Co-founder at Yesper. Writes about AI and the industry that builds the world. benjamin@yesper.ai

Yesper is the AI civil engineer for construction and infrastructure. AFRY, COWI, NRC Group and other Nordic firms use it to halve the time on a study, rerun calculations in minutes, and catch errors that would otherwise slip through. Get in touch if you'd like to see what it can do for you.

Book demo