Run an early-stage surroundings and risk analysis

Projects in dense environments affect neighbours, traffic and utilities, and the risks need to be caught early. Yesper identifies and structures surroundings risks in a risk matrix with proposed protective measures, based on your material. Most relevant early on and ahead of site establishment.

How to do it in Yesper

  1. Describe the project and its surroundings, or point to the material in Secure folders.
  2. Ask Yesper to list surroundings risks (for example vibration, noise, traffic, utilities, sensitive buildings).
  3. Let Yesper structure them in a risk matrix with protective measures.
  4. Review in Yesper and include it in the monitoring programme or EIA.

Settings & tips

  • Ask for a risk matrix (probability times consequence).
  • Combine with map and SGU data for site-specific risks.

Example prompts

Simple

Run a surroundings and risk analysis for our project.

Advanced

Run a surroundings and risk analysis for excavation and utility works along Kungsgatan in Salem: vibration impact on adjacent buildings, traffic and pedestrian routes, crossing utilities and proximity to a preschool. Propose protective measures and control points per risk.

FAQ

Do I get a risk matrix?

Yes, with probability and consequence per risk.

Can it feed into a monitoring programme?

Yes, ask for control points per risk.

Can site data be taken into account?

Yes, for example map and SGU data.