Attached are the bid documents for the refrigeration remodel at Sycamore Hollow Market in Sycamore Hollow, MO: instructions to bidders and general conditions, the Div 11/23 specs, the R-101 floor plan, the case schedule and the 2009 as-builts (refrigeration, power, plumbing and the door schedule). We're bidding it lump sum and the mandatory job walk is Tuesday at 7 AM. Put together a marked-up floor plan with numbered items for demo, new cases, electrical and logistics, plus a checklist for each room, and flag anything the drawings don't show that could hit our number.
Thinking…
The new rack is 7 in. wider than the machine room door. The new freezer island lineup has no floor sink within 30 ft.
Pre-bid site walk, Sycamore Hollow Market