The electrical engineer just sent the reissued lighting sheets for Basalt Ridge Middle School that go out with Addendum No. 2. Can you compare them sheet by sheet against the Bid Set (EL001–EL602 and ES101), mark every change as a comment in the PDF, and tell me which changes aren't clouded or listed in the revision block? Check anything that affects the luminaire schedule or controls against Division 26 too.
Thinking…
ISSUED FOR BID stamp missing on all 32 sheets. Type A2 replaced by A5 on 21 of 24 lighting plans.
Drawing revisions