We're converting the 1978 office building on SR 277 in Silver Station into a middle school for Silver Station City Public Schools. Can you write the schematic design ventilation narrative from the Educational Specifications, the district's HVAC Design Standards, the AHU-1 TAB report, the condition survey, the record and SD drawings and the life safety plans? Performance requirements only, no manufacturers, organized by MasterFormat section, and run the ASHRAE 62.1 outdoor air numbers per unit so we know whether the existing AHU-1 is enough.
Thinking…
The school needs 2.6 times today’s outdoor air. Design Standards and Ed Specs disagree on airflow control.
Ventilation basis of design