Attached are plan sheets SC-101 through SC-104 (Rev D) for the signal and comm cable trough on the Basalt Subdivision through Basalt Crossing, along with the QC checklists and field inspection reports for the trough, handholes, foundations, and the track and road crossings. Can you compare them and give me redlined plan sheets showing only what deviates from the plans, numbered in stationing order? Tolerances are in the special provisions, and Rev B and the ADOT permit for SR 424 are in the folder too.