We got a Priority 2 defect on the insulated joint at the eastward signal at CP West Birch Ford, MP 118.20 on the Birch Sub. Can you fill out our on-track safety plan (MW-201), the track and time request (MW-202) and the track outage request (MW-205) from the defect report, the work plan and the track chart? Pick the on-track safety method and the working limits, and find a work window in the Nov 16–22 schedule before the due date. Last year's track and time for the switch tie job at CP West Birch Ford is attached if it helps.
Thinking…
Signal 2E at CP West Birch Ford rejected as the west limit. Siding signal 6W missing from the request.
On-track safety planning