Attached is the MicroStation DGN for the signal and comm duct bank on the Silver Subdivision through Silver Bend, MP 702.30 to 703.36. It has the plan and the 3D model. Can you pull every handhole, pull box and manhole into an Excel schedule with type, size and depth, taking depth as top of cover minus the bottom of the structure in the 3D model? The SC-401 detail sheets and the underground specs are attached too.
Thinking…
HH-3 is 48 in deep in the model but 36 in in the Item Type data. 2 vaults at SR-305 exist only in the 3D model.
Handhole schedule, Silver Subdivision