Attached is the hourly BTU meter data from Stone Point District Energy for the high school and activity center for 2023–2025, plus NOAA hourly temperatures for the same period. Can you pull peak load, annual heating energy, and delta T as the basis for a first-pass geothermal concept, and show what size heat pump plant and how many bores we'd need if we keep district energy for peaking? Also check delta T against the SPDE service rules, and whether the borefield fits on the practice fields shown on the site plan.
Thinking…
33 of the 50 highest hours are startups after a weekend or break. The raw maximum, 17,903 kBtu/h, is a meter error.
Geothermal sizing from district energy interval data, Stone Point High School