Before we send the Town of Sumac Station our fee proposal for the Route 613 (Depot Street) design, can you check the numbers? The fee estimate is Fee_Estimate_Route613_Depot_St_v3.xlsx, the staffing plan is Design_Schedule_Staffing_Plan_RevB.xlsx, and the draft proposal with the cost proposal form is Fee_Proposal_Route613_DRAFT.docx. Check the formulas and totals, make sure the hours by task match the staffing plan, and confirm every line in Table B-1 is hours × rate.
Thinking…
The fee total leaves out two roles. Final Design is 64 hours short of the staffing plan.
Fee proposal review, Route 613, Sumac Station