Our refrigeration sub sent over their draft JHA and risk register for the CO2 rack install at Laurel Flats Market. Can you finish it against the Div 23 specs, the PT-01 pressure test procedure, the display case IOM manual and the GC's SSSP? I need every hazard rated before and after controls, and hold points with sign-offs before the pressure test, evacuation and charging. Also check their dates against the 3-week lookahead.
Thinking…
The asphyxiation hazard in the machinery room had no fixed gas detection. The draft test pressure would have exceeded the MT and LT sections.
CO2 refrigeration JHA