We're replacing the SR 418 bridge over Heron Creek. Can you build an IFC 4.3 bridge model from the edge-of-deck polylines in SR418_HeronCreek_Edge_of_Deck.dxf and the plan and profile sheets, and merge it with the engineer's concrete model, the fabricator's girder and bolt models, and the bridge rail from Bridge_Rail_Details.pdf into one file we can use for coordination and 3D printing? Also model the existing bridge from TDOT's inspection report and check it against the 22 site photos, and export a DXF so we can confirm the model matches the polylines.
Thinking…
All 62 vertices fall on the edge-of-deck polylines. 40 bolt holes have no bolt at Field Splice 2, Girder G3.
Bridge coordination model